Berrywood Hospital

In just 4 months, SOL Services successfully completed extensive heating system remedial works at Berrywood Hospital, a project that required both mechanical and electrical expertise.

We replaced the boiler heat exchangers, reconfigured the heating circuits with a new plate heat exchanger, and updated the control systems. Our team managed to keep the heating system operational throughout the winter, ensuring patient comfort during construction.

Off-site prefabrication of pipework minimised on-site health and safety risks, while the use of durable materials like 316 stainless steel ensured a long-lasting solution. The hospital now benefits from improved system reliability, enhanced water quality, and greater protection for critical equipment.

The client, Kier, commended our attention to detail and effective management of temporary systems, highlighting the positive impact on their operations.

Overview

  • Berrywood Hospital, Northampton

  • 4 Month Project

  • Mechanical & Renewables